09-22-2017, 04:05 AM
Hi all the holidays are over so it-s back to the shop.
The next job was to cut the shafts to length and fit the retaining screws.
[attachment=15058]
[attachment=15059]
Then the pulleys had to be pined to the shafts to do this I used a 1mm drill and a 1mm end mill , the pin was cut from a length of pivot steel.
[attachment=15060]
Drill the shaft
[attachment=15061]
Mill the slot
[attachment=15062]
Fit the pin
[attachment=15063]
And assemble
[attachment=15064]
The gears can now be fitted in the case.
[attachment=15065]
Slowly slowly Brian.
The next job was to cut the shafts to length and fit the retaining screws.
[attachment=15058]
[attachment=15059]
Then the pulleys had to be pined to the shafts to do this I used a 1mm drill and a 1mm end mill , the pin was cut from a length of pivot steel.
[attachment=15060]
Drill the shaft
[attachment=15061]
Mill the slot
[attachment=15062]
Fit the pin
[attachment=15063]
And assemble
[attachment=15064]
The gears can now be fitted in the case.
[attachment=15065]
Slowly slowly Brian.