11-03-2012, 07:06 PM
hi all i got this sum time a go it needed a new magnet well i replaced the magnet all it needed was the rod on the top i made two new rods i coped the length of a clock stand that i got of john the rod is stainless steel 10mm in di i drilled one of the rods and taped m8 and fitted a m8 cap head with sum bearing fit i cut the cap head dawn to size and scrud it on to the Base the next thing to mack is sum clamps out of stainless steel right pics