05-29-2017, 12:45 PM
Might this be the sort of thing that a crane should handle? I have seen them pluck a roof off a building, set it on the ground, and put it back once the new walls are done.
In fact, with the wall sections prefabbed and ready to go, it could probably be done in a day, 2 at most.
In fact, with the wall sections prefabbed and ready to go, it could probably be done in a day, 2 at most.
Mike
SB 10K (1976) Rockwell vertical mill (1967) Rockwell 17" drill press (1946) Me (1949)
SB 10K (1976) Rockwell vertical mill (1967) Rockwell 17" drill press (1946) Me (1949)