09-08-2012, 05:38 PM
I finally got around to setting up my electrolysis derusting tank.
The rectangular tube is going to be the axle/hydraulic fluid tank for my log splitter. I'm converting my home made 3 point hitch splitter to be self powered and independant of the tractor.
I could easily wire wheel the outside of the rect. tube but the inside is what I really want to clean, it's gonna hold my hydraulic oil.
That's why I have a positive electrode down the center of the tube.
I don't really know how long to keep it going but with all that foaming action I guess I'll shut it off and pull it out before going to bed tonight.
The rectangular tube is going to be the axle/hydraulic fluid tank for my log splitter. I'm converting my home made 3 point hitch splitter to be self powered and independant of the tractor.
I could easily wire wheel the outside of the rect. tube but the inside is what I really want to clean, it's gonna hold my hydraulic oil.
That's why I have a positive electrode down the center of the tube.
I don't really know how long to keep it going but with all that foaming action I guess I'll shut it off and pull it out before going to bed tonight.
Busy Bee 12-36 lathe, Busy Bee Mill drill, Busy Bee 4x6 bandsaw, Homemade 9x17 bandsaw, Ad infinitum.