01-02-2017, 04:48 PM
I worked on getting the shelving over where my lathe and mill are. They were at the other end of the basement. I got the tooling shelf all restocked but still need to tackle the raw materials shelf. The raw materials are spread all over the basement in piles and it all came off of that one shelf.
Some pictures. I'm showing probably about 75% of the materials that came off of the shelf.
Tooling and stock shelves.
Raw material.
I got the rubber material cut out to fit around the vise on the mill table.
Ed
Some pictures. I'm showing probably about 75% of the materials that came off of the shelf.
Tooling and stock shelves.
Raw material.
I got the rubber material cut out to fit around the vise on the mill table.
Ed